Type of FeeFee Amount
Water
Water Connection$750.00
Base Charge (Includes 1000 gallons)$35.00  $35.70
1001-4000 Gallons$8.67 $8.84 per 1000 gallons
4001-7000 Gallons$12.69 $12.94 per 1000 gallons
7000 and up Gallons$25.10 $25.60 per 1000 gallons
State Water Charge Annually$9.72
High Volume Monthly$3.95 $4.03
Extra Volume 2” monthly$4.70 $4.79
 
Sewer
Sewer Connection$750.00
Sewer Improvement per month $7.79 $7.95
Base Charge (Includes 1000 gallons) $52.08 $53.12
1001-4000 Gallons $9.93 $10.13 per 1000 gallons
4001-7000 Gallons $11.68  $11.91 per 1000 gallons
7000 and up Gallons $12.62  $12.87 per 1000 gallons
Flat Sewer Charges (no meter) monthly $52.08 $53.12
Sewer Base Apartment monthly $9.64 $9.83
 
Electric
Electric Connection$750.00
Green Power monthly$2.00 $2.04
City Service charge monthly$400.00
Security Lights monthly$7.75 $7.91
City Street Lights usage per kWh$0.0958 $0.0977
Residential Base monthly $41.88 $42.72
Commercial Base 1 Phase monthly $102.00 $104.04
Commercial Base 3 Phase monthly $122.00 $124.44
Electric usage per kWh$0.0958 $0.0977
Application for interconnecting distributed generation with capacity 20kW or lessNo Charge
Application for interconnecting distributed generation with capacity between 20-40 kW$250.00
Interconnection Charge$570.00
Installation of Connected Alternative Energy SystemsActual Cost
Excess energy generated – Average Retail Energy Rate (MN Statute 216 B.164)Avoided Cost  
  
Miscellaneous
Reconnection$75.00
Repairs to Public Streets, Curbs, or Sidewalks due to installation and repairs$350.00 in addition to Market Rate per square foot
Residential Deposit$125.00
Commercial Deposit$150.00
Past Due Penalty Fee10%
NSF Charge$25.00